PROCEDURES


1: HYDRAULIC COUPLING MOUNTING&DEMOUNTING PROCEDURES
HYDRAULIC COUPLIN DISMANTLING PROCEDURES

2: BECKER RUDDER MOUNTING&DEMOUNTING PROCEDURES
BECKER RUDDER INSTALLATION PROCEDURES_NOT FREE

3: Project Specification Docking and Repairs for DREGER SHIP
Repair Specification rev 1.3 CTA _NOT FREE

4: SAFETY POSTERS.

5: CPP TYPE PROPELLERS OVERHAUL MEASUREMENTS POINTS REPORT
Measurement report RR tunnel thruster type TT _ NOT FREE

6: PROPELLER INSPECTION REPORT COMPLETE
Inspection Report Propeller – 91.1034.6700-01